News

Only available in german
Neuer Gubristtunnel: Ein Fall für BIM und Amberg
2nd International Conference on "Monitoring in geological disposal of…
New distribution agreement for the US and Canada market provides easier…
New Bözberg tunnel (2) – project planning and innovations under complex…
What happens if an electrical car starts to burn in a tunnel?
New Bözberg tunnel (1) – more freight carried by rail
Fault induced rock bursts and micro-tremors
No summer break on the construction site of the third Gubrist tube
FinEst Link tunnel project: Geological aspects and vertical tunnel…
Dutch students discover the Hagerbach Test Gallery
Brenner Base Tunnel: Site visit by Amberg Engineering
Amberg Group at WTC 2018 Dubai
Hagerbach Test Gallery – an impressive success story
Brenner Base Tunnel: The contract for largest construction lot in Austria…
Tunnel System and Safety Concept of the FinEst Link
Dynamic clearance analysis paves way for automated fleet
Only available in german
Tunnel- und Trasseebau mit 110% Steigung
Only available in german
Pioniere unter Tage
BIM Track for Underground Infrastructure: Metro line expansion
Boryong-Taean National Highway Construction Project, South Korea
The best of the best: a magical night in the VSH
Underground Spaces Unveiled: Planning and Creating the Cities of the future…
Long, longer, ultra-long – when length does matter and requires the best in…
Visit of the BahnJournalisten Schweiz to Amberg Technologies AG
BREAKTHROUGH ON THE NORTHERN BYPASS IN ZURICH:
Diving into the Digital Future?
The Gotthard Base Tunnel project receives the 2018 European Railway Award
"Innovation is our watchword!"
Amberg makes the case for BIM
More