Between the two tubes runs a exploration shaft. The shaft will give answers to the geology. It will help to reduce constructions cost and time.
Amberg is responsible for different phase of the design, from the basic design over to the final design. Also, we held the geotechnical site supervision on the Austrian side.
Direct railway link between Austria and Italy Lenght of the Brenner Base Tunnel:
Max. overburden: