Fault induced rock bursts and micro-tremors
In their scientific paper, M. Rehbock and T. Jesel from Amberg Engineering share their experience gained from the construction of the Gotthard Base Tunnel.
Related News
In this fourth news feed about the over 100 km long subsea tunnel project between Helsinki and Tallinn, we take a closer look at different aspects related to the design and the construction.